EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
wcooper
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (179)
Air Conditioning
- (10)
-
New AC Wiring Schematic
-
AC Wiring
-
SCAT Tubes and Hoses
-
FWD NACA Vents
-
A/C Continuted......
-
A/C Continuted...
-
A/C Continuted...
-
A/C Blower Box...
-
A/C Blower Installation
-
Airconditioning and...
Avionics
- (15)
-
The Panel Sees the...
-
Center Console...
-
Autopilot Servo...
-
GTN-650xi Bracket
-
Autopilot Servo Wire...
-
SteinAir Panel Arrives!
-
TO/GA Buttons Pt. 2
-
Infinity Stick Grip...
-
TO/GA Buttons Pt. 1
-
Panel Planning
-
ELT Antenna
-
Static Line Run
-
Pitch and Yaw...
-
ELT Power Jack
-
Pitch and Roll Servo...
Brake System
- (3)
-
Brake Line...
-
Brake Line...
-
Parking Brake
Cabin Cover
- (7)
-
Section 43: Cabin...
-
Section 43: Cabin Cover
-
Section 43: Cabin Cover
-
Section 43: Cabin Cover
-
Section 43: Cabin Cover
-
Section 43: Cabin...
-
Section 43: Cabin Cover
Doors
- (22)
-
Door Frame Edges
-
Door Pins
-
Door Gas Struts
-
Door Seals
-
Door Hing...
-
Door Hinges 2
-
Door Hinges
-
More Doors
-
Door Trimming
-
Door Bonding
-
Door Handle Powder...
-
Door Arm Rests
-
Door Handle Mechanisim
-
Door Mechanisim and...
-
Door Seals
-
PlaneAround Door...
-
Sorting it all out...
-
Section 43: Cabin...
-
Chap 45-04 Gas Strut...
-
Chap 45-04 and...
-
Door Frame
-
Doors - Part 1
Electrical
- (8)
-
Starter Solenoid
-
Some Wires
-
Stic Grip Mounting
-
EarthX Battery Tray Mod
-
New Battery Terminals
-
Electrical System...
-
Main Battery Cables
Empennage
- (16)
-
Elevator Attach
-
Elevator Re-work
-
Elevator Re-work
-
Tailcone Attach
-
Horizontal Stab Attach
-
Horizontal Stab Attach
-
Elevator Attachment
-
Back to work!
-
Pushrod Assembly
-
Tail Cone - Section...
-
Tail Cone - Section 10
-
Elevators - Section 9
-
Horizontal Stab -...
-
Rudder - Section 7
-
Vertical Stab -...
-
Kit Arrives
Engine
Engine Cowl
- (1)
-
Lower Air Scoop...
Fiberglass
- (1)
-
Interior Fiberglass...
Firewall
Flight Controls
- (13)
-
Flap Position Sensor
-
Brake Return Springs
-
A/C Continuted...
-
Sec. 40 Flap System
-
Sec. 40 Flap System
-
Section 40 - Flaps
-
Section 39
-
Stick Grip Unboxing!
-
Control Column
-
Push Rods...
-
Push Rods
-
Rudder Pedals and...
-
Rudder Pedals -...
Fuel System
- (4)
-
Finished Fuel Selector
-
Back to the Fuel...
-
Center Console and...
-
Planning Fuel Line...
Fuselage
- (32)
-
Tailcone Forward Top...
-
Windows!
-
Rudder Cable Vinyl...
-
Tailcone Forward Top...
-
Tailcone Forward Top...
-
SECTION 35: ACCESS...
-
Forward Fuselage
-
Empenage Attach
-
Empenage Attach
-
Finish and FWF Kit...
-
Rudder Cables
-
Tunnel Access...
-
Rear Seat Floor Pans
-
Tie Downs
-
Access Panels
-
Sec. 33 Baggage Area
-
Tailcone Attach
-
Tailcone Attach
-
Baggage Door
-
Baggage Door
-
Section 29 and Main...
-
Tailcone Skin Riveting
-
Tailcone Skin Riveting
-
Tailcone Attach
-
Step Installation
-
Powder Coated Parts
-
BAGGAGE FLOOR ANGLES
-
QB Fuse
-
QB Fuse
-
QB Fuse
-
Inventory
-
Fuse Arrival
Hangar
- (5)
-
Best Tugs Unboxing!
-
Big Ass Fan
-
Let There Be Light!
-
Settling In
-
Moving Day
Inspection
- (2)
-
Tech Counselor Visit
-
Tech Counselor Visit
Interior Finish
- (11)
-
Small Panels Pt. 2
-
Small Panels
-
Rear Seat Air Vent
-
Center Console
-
Overhead Console Wiring
-
Another Try...
-
Front Seat Uppholstry
-
Front Seat Uppholstry
-
Front Seat...
-
Front Seat...
-
Front Seat Installation
Landing Gear
- (2)
-
Tire Instalation
-
Wheels and Brakes...
Lighting
Paint
- (2)
-
Paint
-
Primer and HVLP...
Propeller
- (1)
-
Propeller Unboxing
Registration
- (1)
-
We Picked an N Number!
Research
- (3)
-
AirVenture 2022
-
Practice
-
Research Trip to...
Training
- (8)
-
CanBus Wire
-
Stripping and...
-
Fiberglass for RV...
-
More Relay Fun -...
-
Practice Relay Circuit
-
AEA Avionics...
-
EAA Sport Air...
-
Sheet Metal Class
Tools
- (4)
-
Jacks
-
Terminal Tool
-
Trailing Edge...
-
Tools
Wings
- (3)
-
Zip Tips - Unboxing
-
QB Wings Arrival !!!
-
Kit Order Status
Workshop
- (2)
-
Wing Cradle
-
Workshop
LCP
- (1)
-
Ailerons and Flaps
Builder Name:
William Cooper
-
Project:
Vans - RV-10
-
VIEW REPORTS
Total Hours:
29.5
Total Flight Time:
Total Expense:
$175687.69
Start/Last Date:
Jan 29, 2019 - No Finish Date
Engine:
Lycoming YIO-540-D4A5 RT(Y)
Propeller:
Hartzell C2YR-1BFP/F8068D
Panel:
Garmin
Friendly URL:
https://eaabuilderslog.org?s=wcooper
Home or Last Project Picture
Nov 10, 2019
Tail Cone - Section 10
Category: Empennage
It's really starting to look like something now. Putting the tail cone together starts to give an idea as to the scale of this. Got the hard to reach rivets with the help of my daughter Sheena. Will get to the aft deck next. Majority of skins were back riveted. Turned out very nice. For the flanges on the curved part of the bulkheads I got my daughter Sheena to help buck. I used a sliced off portion of a rubber tube as sort of a shim to help press the flange tight and set the rivet about half way. Then removed the tube and set the rivet the rest of the way. Plan to run some wires for the elevator trim and tail light before I close up the top skins.
IMG_7562.JPG
IMG_7536.jpg
IMG_7538.jpg
IMG_7540.jpg
IMG_7569.JPG
IMG_7563.jpg
IMG_7566.jpg
IMG_7567.jpg
IMG_7596.JPG
IMG_7570.jpg
IMG_7573.jpg
IMG_7578.jpg
IMG_7594.jpg
IMG_7595.jpg
IMG_7596.jpg
IMG_7632.jpg
IMG_7649.jpg
IMG_8689.jpg
IMG_8690.jpg
IMG_8695.jpg
IMG_8696.jpg
IMG_8697.jpg
IMG_8698.jpg
IMG_8708.jpg
IMG_8761.jpg
IMG_8762.jpg
IMG_8763.jpg
IMG_8765.jpg
IMG_8767.jpg
IMG_8783.jpg
IMG_8785.jpg
IMG_8832.jpg
IMG_8833.jpg
IMG_8834.jpg
IMG_8835.jpg
0A5004F0-763F-4FD4-BCD7-7D94AD33FF44.jpeg
IMG_8843.jpg
IMG_8847.jpg
IMG_8848.jpg
IMG_8849.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.